Line 6: Line 6:
 | RSCW 3 | LTP 3 (Jan-Jun 2021) | 16 | 8-10 September 2020 | **3rd opportunity for RS payload to characterise and calibrate the instruments.** \\ RSCW3: 3-day window of RS instrument specific characterisation and calibration campaigns (extra-cold checkout), no coordinated activities. | 2021-03-21T00:​00:​00 - 2021-03-24T00:​00:​00<​ | RAL (Coach) \\ MPS (Trainee) \\ ([[mailto:​teriaca@mps.mpg.de|Luca Teriaca]]) | | RSCW 3 | LTP 3 (Jan-Jun 2021) | 16 | 8-10 September 2020 | **3rd opportunity for RS payload to characterise and calibrate the instruments.** \\ RSCW3: 3-day window of RS instrument specific characterisation and calibration campaigns (extra-cold checkout), no coordinated activities. | 2021-03-21T00:​00:​00 - 2021-03-24T00:​00:​00<​ | RAL (Coach) \\ MPS (Trainee) \\ ([[mailto:​teriaca@mps.mpg.de|Luca Teriaca]]) |
 | Star Calibration campaign | LTP 3 (Jan-Jun 2021) | 16 | 8-10 September 2020 | **Coordinated Star Calibration campaign** (context in TN-0037) between Metis, EUI/HRI, SPICE and PHI/FDT, featuring sigma sgr. | 2021-03-27T00:​00:​00 -& 2021-03-27T02:​00:​00 | RAL (Coach)\\ MPS (Trainee)\\ ([[mailto:​teriaca@mps.mpg.de|Luca Teriaca]]) | | Star Calibration campaign | LTP 3 (Jan-Jun 2021) | 16 | 8-10 September 2020 | **Coordinated Star Calibration campaign** (context in TN-0037) between Metis, EUI/HRI, SPICE and PHI/FDT, featuring sigma sgr. | 2021-03-27T00:​00:​00 -& 2021-03-27T02:​00:​00 | RAL (Coach)\\ MPS (Trainee)\\ ([[mailto:​teriaca@mps.mpg.de|Luca Teriaca]]) |
-| RSCW 4 | LTP 4 (July-Sep 2021) | 17 | January 2021 | **RSCW4: 4th opportunity for RS payload to characterise and calibrate the instruments.**\\ Limb Pointing RS-Alignment campaign, involving limb pointings to N,S,E,W + disc centre.\\ The whole campaign takes about 8 hours, based on SPICE durations of full scans.\\ RS+IS SOOP to try out first coordinated science campaign, incl. VSTP cycle.\\ L_SMALL_HRES_HCAD_SlowWindConnection SOOP scheduled from 26 to 29 Sep 2021. | 2021-09-22T02:​30:​00 - 2021-09-30T00:​00:​00 | MPS (Coach)\\ ([[mailto:​teriaca@mps.mpg.de|Luca Teriaca]])\\ IAS (Trainee) ([[mailto:​susanna.parenti@ias.u-psud.fr|Luca Teriaca]]), Terry (August ​STPs+Quadrature) |+| RSCW 4 | LTP 4 (July-Sep 2021) | 17 | January 2021 | **RSCW4: 4th opportunity for RS payload to characterise and calibrate the instruments.**\\ Limb Pointing RS-Alignment campaign, involving limb pointings to N,S,E,W + disc centre.\\ The whole campaign takes about 8 hours, based on SPICE durations of full scans.\\ RS+IS SOOP to try out first coordinated science campaign, incl. VSTP cycle.\\ L_SMALL_HRES_HCAD_SlowWindConnection SOOP scheduled from 26 to 29 Sep 2021. | 2021-09-22T02:​30:​00 - 2021-09-30T00:​00:​00 | RSCW4: ​[[mailto:​teriaca@mps.mpg.de|Luca Teriaca]])/[[mailto:​susanna.parenti@ias.u-psud.fr|Susanna Parenti]]\\ August Quadrature: [[mailto:​Therese.A.Kucera@nasa.gov|Terry Kucera]])/​[[mailto:​miho.janvier@ias.u-psud.fr|Miho Janvier]] ​|
 |  | LTP 5 (Oct-Dec 2021) | 18 | July 2021 | Sun-Earth line crossing | TBD | TBD | |  | LTP 5 (Oct-Dec 2021) | 18 | July 2021 | Sun-Earth line crossing | TBD | TBD |
 |  | LTP 6 (Jan-Mar 2022) | 19 | October 2021 | TBD | TBD | TBD | |  | LTP 6 (Jan-Mar 2022) | 19 | October 2021 | TBD | TBD | TBD |