This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
public:planning_schedule [2021/03/29 15:34] frederic auchere |
public:planning_schedule [2021/03/29 15:37] (current) frederic auchere |
||
---|---|---|---|
Line 6: | Line 6: | ||
| RSCW 3 | LTP 3 (Jan-Jun 2021) | 16 | 8-10 September 2020 | **3rd opportunity for RS payload to characterise and calibrate the instruments.** \\ RSCW3: 3-day window of RS instrument specific characterisation and calibration campaigns (extra-cold checkout), no coordinated activities. | 2021-03-21T00:00:00 - 2021-03-24T00:00:00< | RAL (Coach) \\ MPS (Trainee) \\ ([[mailto:teriaca@mps.mpg.de|Luca Teriaca]]) | | | RSCW 3 | LTP 3 (Jan-Jun 2021) | 16 | 8-10 September 2020 | **3rd opportunity for RS payload to characterise and calibrate the instruments.** \\ RSCW3: 3-day window of RS instrument specific characterisation and calibration campaigns (extra-cold checkout), no coordinated activities. | 2021-03-21T00:00:00 - 2021-03-24T00:00:00< | RAL (Coach) \\ MPS (Trainee) \\ ([[mailto:teriaca@mps.mpg.de|Luca Teriaca]]) | | ||
| Star Calibration campaign | LTP 3 (Jan-Jun 2021) | 16 | 8-10 September 2020 | **Coordinated Star Calibration campaign** (context in TN-0037) between Metis, EUI/HRI, SPICE and PHI/FDT, featuring sigma sgr. | 2021-03-27T00:00:00 -& 2021-03-27T02:00:00 | RAL (Coach)\\ MPS (Trainee)\\ ([[mailto:teriaca@mps.mpg.de|Luca Teriaca]]) | | | Star Calibration campaign | LTP 3 (Jan-Jun 2021) | 16 | 8-10 September 2020 | **Coordinated Star Calibration campaign** (context in TN-0037) between Metis, EUI/HRI, SPICE and PHI/FDT, featuring sigma sgr. | 2021-03-27T00:00:00 -& 2021-03-27T02:00:00 | RAL (Coach)\\ MPS (Trainee)\\ ([[mailto:teriaca@mps.mpg.de|Luca Teriaca]]) | | ||
- | | RSCW 4 | LTP 4 (July-Sep 2021) | 17 | January 2021 | **RSCW4: 4th opportunity for RS payload to characterise and calibrate the instruments.**\\ Limb Pointing RS-Alignment campaign, involving limb pointings to N,S,E,W + disc centre.\\ The whole campaign takes about 8 hours, based on SPICE durations of full scans.\\ RS+IS SOOP to try out first coordinated science campaign, incl. VSTP cycle.\\ L_SMALL_HRES_HCAD_SlowWindConnection SOOP scheduled from 26 to 29 Sep 2021. | 2021-09-22T02:30:00 - 2021-09-30T00:00:00 | MPS (Coach)\\ ([[mailto:teriaca@mps.mpg.de|Luca Teriaca]])\\ IAS (Trainee), Terry (August STPs+Quadrature) | | + | | RSCW 4 | LTP 4 (July-Sep 2021) | 17 | January 2021 | **RSCW4: 4th opportunity for RS payload to characterise and calibrate the instruments.**\\ Limb Pointing RS-Alignment campaign, involving limb pointings to N,S,E,W + disc centre.\\ The whole campaign takes about 8 hours, based on SPICE durations of full scans.\\ RS+IS SOOP to try out first coordinated science campaign, incl. VSTP cycle.\\ L_SMALL_HRES_HCAD_SlowWindConnection SOOP scheduled from 26 to 29 Sep 2021. | 2021-09-22T02:30:00 - 2021-09-30T00:00:00 | RSCW4: [[mailto:teriaca@mps.mpg.de|Luca Teriaca]])/[[mailto:susanna.parenti@ias.u-psud.fr|Susanna Parenti]]\\ August Quadrature: [[mailto:Therese.A.Kucera@nasa.gov|Terry Kucera]])/[[mailto:miho.janvier@ias.u-psud.fr|Miho Janvier]] | |
| | LTP 5 (Oct-Dec 2021) | 18 | July 2021 | Sun-Earth line crossing | TBD | TBD | | | | LTP 5 (Oct-Dec 2021) | 18 | July 2021 | Sun-Earth line crossing | TBD | TBD | | ||
| | LTP 6 (Jan-Mar 2022) | 19 | October 2021 | TBD | TBD | TBD | | | | LTP 6 (Jan-Mar 2022) | 19 | October 2021 | TBD | TBD | TBD | |