User Tools

Site Tools


public:planning_schedule

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:planning_schedule [2020/06/16 17:40]
stephane caminade
public:planning_schedule [2021/03/29 15:37] (current)
frederic auchere
Line 1: Line 1:
 ^ Window # ^ LTP # ^ SOWG # ^ SOWG Dates ^ Science/​Target ^ Windows Date ^ Planners names/​details | ^ Window # ^ LTP # ^ SOWG # ^ SOWG Dates ^ Science/​Target ^ Windows Date ^ Planners names/​details |
 | Star Calibration campaign ​ | LTP1 (Jan-Jun 2020) | 14 | July 2019 | Coordinated Star Calibration campaign between Metis, EUI/HRI and SPICE, featuring alpha Leo. The S/C will be pointed at the limb around the time of the star's ingress and egress. EUI/HRI will observe at both positions, SPICE only at the latter. | 2020-06-16T05:​00:​00 - 2020-06-17T23:​00:​00 | RAL | | Star Calibration campaign ​ | LTP1 (Jan-Jun 2020) | 14 | July 2019 | Coordinated Star Calibration campaign between Metis, EUI/HRI and SPICE, featuring alpha Leo. The S/C will be pointed at the limb around the time of the star's ingress and egress. EUI/HRI will observe at both positions, SPICE only at the latter. | 2020-06-16T05:​00:​00 - 2020-06-17T23:​00:​00 | RAL |
-| RSCW 1 | LTP1 (Jan-Jun 2020) | 14 | July 2019 | **1st opportunity for RS payload to characterise and calibrate the instruments**. Limb Pointing RS-Alignment campaign, involving limb pointings to N,S,E,W + disc centre. The whole campaign takes 8,75 hours, driven SPICE durations of full scans (100mins). | 2020-06-20T05:​00:​00 - 2020-06-21T00:​50:​00 | RAL |+| RSCW 1 | LTP1 (Jan-Jun 2020) | 14 | July 2019 | **1st opportunity for RS payload to characterise and calibrate the instruments**.\\ Limb Pointing RS-Alignment campaign, involving limb pointings to N,S,E,W + disc centre. The whole campaign takes 8,75 hours, driven SPICE durations of full scans (100mins). | 2020-06-20T05:​00:​00 - 2020-06-21T00:​50:​00 | RAL |
 | No RSCW | LTP 2 (July-Dec 2020) | 15 | 30-31 March 2020 | N/A | N/A | N/A | | No RSCW | LTP 2 (July-Dec 2020) | 15 | 30-31 March 2020 | N/A | N/A | N/A |
-| RSCW 2 | LTP 3 (Jan-Jun 2021) | 16 | 6-8 July 2020 | **2nd opportunity for RS payload to characterise and calibrate the instruments.** \\ RSCW2: 5-day window of RS instrument specific characterisation and calibration campaigns (warm checkout) | 2021-02-21T10:​15:​00 - 2021-02-25T00:​00:​00 | RAL (Coach) \\ MPS (Trainee) \\ ([[mailto:​teriaca@mps.mpg.de|Luca Teriaca]]) | +| RSCW 2 | LTP 3 (Jan-Jun 2021) | 16 | 8-10 September ​2020 | **2nd opportunity for RS payload to characterise and calibrate the instruments.** \\ RSCW2: 5-day window of RS instrument specific characterisation and calibration campaigns (warm checkout) | 2021-02-21T10:​15:​00 - 2021-02-25T00:​00:​00 | RAL (Coach) \\ MPS (Trainee) \\ ([[mailto:​teriaca@mps.mpg.de|Luca Teriaca]]) | 
-| RSCW 3 | LTP 3 (Jan-Jun 2021) | 16 | 6-8 July 2020 | **3rd opportunity for RS payload to characterise and calibrate the instruments.** \\ RSCW3: 3-day window of RS instrument specific characterisation and calibration campaigns (extra-cold checkout), no coordinated activities. | 2021-03-21T00:​00:​00 - 2021-03-24T00:​00:​00<​ | RAL (Coach) \\ MPS (Trainee) \\ ([[mailto:​teriaca@mps.mpg.de|Luca Teriaca]]) | +| RSCW 3 | LTP 3 (Jan-Jun 2021) | 16 | 8-10 September ​2020 | **3rd opportunity for RS payload to characterise and calibrate the instruments.** \\ RSCW3: 3-day window of RS instrument specific characterisation and calibration campaigns (extra-cold checkout), no coordinated activities. | 2021-03-21T00:​00:​00 - 2021-03-24T00:​00:​00<​ | RAL (Coach) \\ MPS (Trainee) \\ ([[mailto:​teriaca@mps.mpg.de|Luca Teriaca]]) | 
-| Star Calibration campaign | LTP 3 (Jan-Jun 2021) | 16 | 6-8 July 2020 | **Coordinated Star Calibration campaign** (context in TN-0037) between Metis, EUI/HRI, SPICE and PHI/FDT, featuring sigma sgr. | 2021-03-27T00:​00:​00 -& 2021-03-27T02:​00:​00 | RAL (Coach)\\ MPS (Trainee)\\ ([[mailto:​teriaca@mps.mpg.de|Luca Teriaca]]) | +| Star Calibration campaign | LTP 3 (Jan-Jun 2021) | 16 | 8-10 September ​2020 | **Coordinated Star Calibration campaign** (context in TN-0037) between Metis, EUI/HRI, SPICE and PHI/FDT, featuring sigma sgr. | 2021-03-27T00:​00:​00 -& 2021-03-27T02:​00:​00 | RAL (Coach)\\ MPS (Trainee)\\ ([[mailto:​teriaca@mps.mpg.de|Luca Teriaca]]) | 
-| RSCW 4 | LTP 4 (July-Dec 2021) | 17 | January 2021 | **RSCW4: 4th opportunity for RS payload to characterise and calibrate the instruments.**\\ Limb Pointing RS-Alignment campaign, involving limb pointings to N,S,E,W + disc centre.\\ The whole campaign takes about 8 hours, based on SPICE durations of full scans.\\ RS+IS SOOP to try out first coordinated science campaign, incl. VSTP cycle.\\ L_SMALL_HRES_HCAD_SlowWindConnection SOOP scheduled from 26 to 29 Sep 2021. | 2021-09-22T02:​30:​00 - 2021-09-30T00:​00:​00 | MPS (Coach)\\ ([[mailto:​teriaca@mps.mpg.de|Luca Teriaca]])\\ ​IAS (Trainee) | +| RSCW 4 | LTP 4 (July-Sep 2021) | 17 | January 2021 | **RSCW4: 4th opportunity for RS payload to characterise and calibrate the instruments.**\\ Limb Pointing RS-Alignment campaign, involving limb pointings to N,S,E,W + disc centre.\\ The whole campaign takes about 8 hours, based on SPICE durations of full scans.\\ RS+IS SOOP to try out first coordinated science campaign, incl. VSTP cycle.\\ L_SMALL_HRES_HCAD_SlowWindConnection SOOP scheduled from 26 to 29 Sep 2021. | 2021-09-22T02:​30:​00 - 2021-09-30T00:​00:​00 | RSCW4: ​[[mailto:​teriaca@mps.mpg.de|Luca Teriaca]])/​[[mailto:​susanna.parenti@ias.u-psud.fr|Susanna Parenti]]\\ August Quadrature: [[mailto:​Therese.A.Kucera@nasa.gov|Terry Kucera]])/​[[mailto:​miho.janvier@ias.u-psud.fr|Miho Janvier]] ​
-NMP Segment 1, LTP 5, RSW 1,2,3 | LTP (Jan-Jun 2022) | 18 July 2021 | TBD | TBD | TBD | + ​| ​LTP 5 (Oct-Dec 2021) | 18 | July 2021 | Sun-Earth line crossing | TBD | TBD | 
-NMP Segment 1, LTP 6, RSW 1,2,3 | LTP (July-Dec 2022) | 19 January ​2022 | TBD | TBD | TBD | +|  ​| LTP (Jan-Mar 2022) | 19 October ​2021 | TBD | TBD | TBD | 
-NMP Segment 2, LTP 7, RSW 1,2,3 | LTP (Jan-Jun 2023) | 20 July 2022 | TBD | TBD | TBD | + ​| ​LTP 7 (Apr-Jun 2022) | 20 | January 2022 | TBD | TBD | TBD | 
-NMP Segment 2, LTP 8, RSW 1,2,3 | LTP (July-Dec 2023) | 21 January ​2023 | TBD | TBD | TBD | +|  ​| LTP (July-Sep 2022) | 21 April 2022 | TBD | TBD | TBD | 
-NMP Segment 3, LTP 9, RSW 1,2,3 | LTP (Jan-Jun 2024) | 22 July 2023 | TBD | TBD | TBD | + ​| ​LTP 9 (Oct-Dec 2022) | 22 | July 2022 | TBD | TBD | TBD | 
-NMP Segment 3, LTP 10, RSW 1,2,3 | LTP 10 (July-Dec 2024) | 23 January ​2024 | TBD | TBD | TBD | +|  ​| LTP 10 (Jan-Mar 2023) | 23 October ​2022 | TBD | TBD | TBD | 
-NMP Segment 4, LTP 11, RSW 1,2,3 | LTP 11 (Jan-Jun 2025) | 24 July 2024 | TBD | TBD | TBD | + ​| ​LTP 11 (Apr-Jun 2023) | 24 | January 2023 | TBD | TBD | TBD | 
-NMP Segment 4, LTP 12, RSW 1,2,3 | LTP 12 (July-Dec 2025) | 25 January ​2025 | Example: 5 days PolarScience,​ offpointing (RSW 1), 15 days Pole-to-Pole,​ disk centre (RSW 1+2), 10 days SlowWindConnection,​ feature tracking (RSW 3) | TBD | TBD |+|  ​| LTP 12 (July-Sep 2023) | 25 April 2023 | TBD | TBD | TBD | 
 + ​| ​LTP 13 (Oct-Dec 2023) | 26 | July 2023 | TBD | TBD | TBD | 
 +|  ​| LTP 14 (Jan-Mar 2024) | 27 October ​2023 | TBD | TBD | TBD | 
 + ​| ​LTP 15 (Apr-Jun 2024) | 28 | January 2024 | TBD | TBD | TBD | 
 +|  ​| LTP 16 (July-Sep 2024) | 29 April 2024 | TBD | TBD | TBD | 
 + ​| ​LTP 17 (Oct-Dec 2025) | 30 | July 2024 | TBD | TBD | TBD | 
 +|  ​| LTP 18 (Jan-Mar 2025) | 31 October ​2024 | TBD | TBD | TBD | 
 + ​| ​LTP 19 (Apr-Jun 2025) | 32 | January 2025 | TBD | TBD | TBD | 
 +|  ​| LTP 20 (July-Sep 2025) | 33 April 2025 | Example: 5 days PolarScience,​ offpointing (RSW 1), 15 days Pole-to-Pole,​ disk centre (RSW 1+2), 10 days SlowWindConnection,​ feature tracking (RSW 3) | TBD | TBD |
  
  
public/planning_schedule.1592322050.txt.gz · Last modified: 2020/06/16 17:40 by stephane caminade