User Tools

Site Tools


public:planning_schedule

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Last revision Both sides next revision
public:planning_schedule [2021/03/29 15:33]
frederic auchere
public:planning_schedule [2021/03/29 15:35]
frederic auchere
Line 6: Line 6:
 | RSCW 3 | LTP 3 (Jan-Jun 2021) | 16 | 8-10 September 2020 | **3rd opportunity for RS payload to characterise and calibrate the instruments.** \\ RSCW3: 3-day window of RS instrument specific characterisation and calibration campaigns (extra-cold checkout), no coordinated activities. | 2021-03-21T00:​00:​00 - 2021-03-24T00:​00:​00<​ | RAL (Coach) \\ MPS (Trainee) \\ ([[mailto:​teriaca@mps.mpg.de|Luca Teriaca]]) | | RSCW 3 | LTP 3 (Jan-Jun 2021) | 16 | 8-10 September 2020 | **3rd opportunity for RS payload to characterise and calibrate the instruments.** \\ RSCW3: 3-day window of RS instrument specific characterisation and calibration campaigns (extra-cold checkout), no coordinated activities. | 2021-03-21T00:​00:​00 - 2021-03-24T00:​00:​00<​ | RAL (Coach) \\ MPS (Trainee) \\ ([[mailto:​teriaca@mps.mpg.de|Luca Teriaca]]) |
 | Star Calibration campaign | LTP 3 (Jan-Jun 2021) | 16 | 8-10 September 2020 | **Coordinated Star Calibration campaign** (context in TN-0037) between Metis, EUI/HRI, SPICE and PHI/FDT, featuring sigma sgr. | 2021-03-27T00:​00:​00 -& 2021-03-27T02:​00:​00 | RAL (Coach)\\ MPS (Trainee)\\ ([[mailto:​teriaca@mps.mpg.de|Luca Teriaca]]) | | Star Calibration campaign | LTP 3 (Jan-Jun 2021) | 16 | 8-10 September 2020 | **Coordinated Star Calibration campaign** (context in TN-0037) between Metis, EUI/HRI, SPICE and PHI/FDT, featuring sigma sgr. | 2021-03-27T00:​00:​00 -& 2021-03-27T02:​00:​00 | RAL (Coach)\\ MPS (Trainee)\\ ([[mailto:​teriaca@mps.mpg.de|Luca Teriaca]]) |
-| RSCW 4 | LTP 4 (July-Sep 2021) | 17 | January 2021 | **RSCW4: 4th opportunity for RS payload to characterise and calibrate the instruments.**\\ Limb Pointing RS-Alignment campaign, involving limb pointings to N,S,E,W + disc centre.\\ The whole campaign takes about 8 hours, based on SPICE durations of full scans.\\ RS+IS SOOP to try out first coordinated science campaign, incl. VSTP cycle.\\ L_SMALL_HRES_HCAD_SlowWindConnection SOOP scheduled from 26 to 29 Sep 2021. | 2021-09-22T02:​30:​00 - 2021-09-30T00:​00:​00 | MPS (Coach)\\ ([[mailto:​teriaca@mps.mpg.de|Luca Teriaca]])\\ IAS (Trainee), Terry (August STPs+Quadrature) | +| RSCW 4 | LTP 4 (July-Sep 2021) | 17 | January 2021 | **RSCW4: 4th opportunity for RS payload to characterise and calibrate the instruments.**\\ Limb Pointing RS-Alignment campaign, involving limb pointings to N,S,E,W + disc centre.\\ The whole campaign takes about 8 hours, based on SPICE durations of full scans.\\ RS+IS SOOP to try out first coordinated science campaign, incl. VSTP cycle.\\ L_SMALL_HRES_HCAD_SlowWindConnection SOOP scheduled from 26 to 29 Sep 2021. | 2021-09-22T02:​30:​00 - 2021-09-30T00:​00:​00 | [[mailto:​teriaca@mps.mpg.de|Luca Teriaca]])/​[[mailto:​susanna.parenti@ias.u-psud.fr|Susanna Parenti]], Terry (August STPs+Quadrature) | 
-|  | LTP 5 (Oct-Dec 2021) | 18 | July 2021 | TBD | TBD | TBD |+|  | LTP 5 (Oct-Dec 2021) | 18 | July 2021 | Sun-Earth line crossing ​| TBD | TBD |
 |  | LTP 6 (Jan-Mar 2022) | 19 | October 2021 | TBD | TBD | TBD | |  | LTP 6 (Jan-Mar 2022) | 19 | October 2021 | TBD | TBD | TBD |
 |  | LTP 7 (Apr-Jun 2022) | 20 | January 2022 | TBD | TBD | TBD | |  | LTP 7 (Apr-Jun 2022) | 20 | January 2022 | TBD | TBD | TBD |
public/planning_schedule.txt · Last modified: 2021/03/29 15:37 by frederic auchere